Detail výsledku

Reflecting RTOS Model During WCET Timing Analysis: MSP430/FreeRTOS Case Study

STRNADEL, J.; RAJNOHA, P. Reflecting RTOS Model During WCET Timing Analysis: MSP430/FreeRTOS Case Study. Acta Electrotechnica et Informatica, 2012, vol. 12, no. 4, p. 17-29. ISSN: 1335-8243.
Typ
článek v časopise
Jazyk
anglicky
Autoři
Strnadel Josef, Ing., Ph.D., UPSY (FIT)
Rajnoha Peter, Ing.
Abstrakt

The determination of the execution time upper bound, commonly called Worst-Case Execution Time (WCET), is a necessary step in the development and validation process for real-time systems. The WCET analysis techniques can be classified as static or dynamic. While a high-level language code suffices for the static techniques, for a precise WCET analysis a target architecture or its authentic simulator able to run the final machine-level code of an analyzed application is needed by the dynamic techniques. In the paper, we have decided not only to present a novel hybrid timing analysis technique, but also to show its practical applicability in the area of WCET analysis over particular embedded architecture (MSP430) and real-time operating system (FreeRTOS). Novelty of the presented method can be seen in the fact the operating system model is reflected during the analysis in order to facilitate the process of derivating schedulability test formulas, create detail task/stack analysis etc. Applicability of the method was tested using the MSPsim simulator of the MSP430 architecture.

Klíčová slova

analysis, assembly, compiler, FreeRTOS, model, MSPsim, MSP430, operating system, profiler, real time, response time, simulator, worst case, execution time

URL
Rok
2012
Strany
17–29
Časopis
Acta Electrotechnica et Informatica, roč. 12, č. 4, ISSN 1335-8243
DOI
BibTeX
@article{BUT98564,
  author="Josef {Strnadel} and Peter {Rajnoha}",
  title="Reflecting RTOS Model During WCET Timing Analysis: MSP430/FreeRTOS Case Study",
  journal="Acta Electrotechnica et Informatica",
  year="2012",
  volume="12",
  number="4",
  pages="17--29",
  doi="10.2478/v10198-012-0041-3",
  issn="1335-8243",
  url="http://www.aei.tuke.sk/papers/2012/4/03_Strnadel.pdf"
}
Projekty
Centrum excelence IT4Innovations, MŠMT, Operační program Výzkum a vývoj pro inovace, ED1.1.00/02.0070, zahájení: 2011-01-01, ukončení: 2015-12-31, ukončen
Pokročilé bezpečné, spolehlivé a adaptivní IT, VUT, Vnitřní projekty VUT, FIT-S-11-1, zahájení: 2011-01-01, ukončení: 2013-12-31, ukončen
Výzkum informačních technologií z hlediska bezpečnosti, MŠMT, Institucionální prostředky SR ČR (např. VZ, VC), MSM0021630528, zahájení: 2007-01-01, ukončení: 2013-12-31, řešení
Výzkumné skupiny
Pracoviště
Nahoru